(1) An initial survey before the ship is put in service; (2) a renewal survey at intervals not exceeding 5 years; and (3) an annual survey within 3 months before or after each anniversary date of the certificate.
What surveys are required for an International Load Line Certificate?
Typography
- Font Size
- Default
- Reading Mode