After any load line survey has been completed, no change is allowed to be made in the structure, equipment, arrangements, material or scantlings covered by the survey, without the sanction of the flag State Administration.
To ensure maintenance of the Conditions of Assignment after survey, what is not allowed?
Typography
- Font Size
- Default
- Reading Mode