Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/shtion/domains/shipinspection.eu/public_html/old/plugins/system/t3/includes/menu/megamenu.php on line 137
What should a master do before coils of steel are loaded from a quayside?
30
Wed, Dec
0 New Articles
 

What should a master do before coils of steel are loaded from a quayside?

MCA Oral Exam Questions
Typography

(1) Seek guidance from the P&I club correspondent as to extent of rusting that will be acceptable. 

(2) Arrange for an independent pre-load survey of the steel coils on the quayside. (3) If no surveyor is available, carry out a survey in person, taking photographs of the steel and recording.

 

BLOG COMMENTS POWERED BY DISQUS

SPONSORED: Amber For Sale - Loose Amber, Amber Gemstones on Sale -  https://ambersale.com 

Do you like Natural Baltic Amber?